MasteryForge Crafts
MasteryForge Metal Workplan — Metalworking Project Plans
MasteryForge Metal Workplan — Metalworking Project Plans
Regular price
$37.00 USD
Regular price
Sale price
$37.00 USD
Shipping calculated at checkout.
Quantity
Couldn't load pickup availability
Choose your next workshop or home project with MasteryForge Metal Workplan, a digital collection of metalworking project plans.
- Explore plans for workshop furniture, storage and outdoor projects, including a steel workbench with vise mount, rolling welding cart, firewood rack, garage shelving, plant stand and tool wall rack.
- Browse original MasteryForge plans alongside collections covering machines, metalworking and bench projects.
- Review individual plans before building. The original firewood-rack plan includes a material cut list with quantities and dimensions in inches and millimeters, a tools list, numbered assembly steps and drawing views.
Digital delivery: your download includes a PDF with the link to the project-plan library. No physical product, tools or materials are included.
For welded projects, you will need welding equipment and safe fabrication practices. Check the selected plan against your tools, materials and intended use before cutting or assembling.
